Guyana Goldfields Inc. - Aurora Project - Wed Jun 24, 2015

Dec 12, 2014 Guyana Goldfields Inc: SAG Mill Arrives At Aurora Gold Proje read more Dec 05 Financials @ 5% Discount Rate, Aurora Gold Project Mine Plan Parameters. Gold Price Average Mill Throughput, 5,000 tpd / 10,000 tpd.

   Chat Online>>

Fortuna upgrades mill expansion at San Jose from 1,500 to 1,800 tpd

18 Jun 2013 Mill expansion to 1,800 tpd on track and scheduled to be commissioned in the third quarter ounces of contained silver and 165,700 ounces of contained gold at average grades of 189 This new rate of capacity at 1,800 tpd

   Chat Online>>

Press Release - Allied Nevada Gold

26 Nov 2014 goal of maintaining the throughput rate of the initial phase of the mill processing capacity of 60,000 tons per day (“tpd”), with a potential to

   Chat Online>>

Detour Gold Corporation - Projects - Detour Lake Mine - Detour

A total of 19.4 Mt was mined in Phase 1 (equivalent to mining rates of 215,000 tpd), approximately 3% lower than the annual budgeted rate of 222,000 tpd.

   Chat Online>>

Alamos Gold Inc. - Mines and Projects - Producing Mine - Mulatos

The mine was built at a cost of approximately $74 million with the first gold pour at an approximate cost of $61 million and constructed a 500 tpd mill to process

   Chat Online>>

Operations - New Afton - 2013 Annual Review - New Gold

New Afton emerged as New Gold's most valuable operating asset in 2013, British Columbia, the New Afton Mine is a low-cost gold and copper producer with led to a plan for mill expansion that targets ramp-up to 14,000 tpd in mid-2015.

   Chat Online>>

Primero Announces Expansion of Its San Dimas Mine to 3,000 TPD

7 Aug 2014 This new mine plan shows average production of approximately 215,000 gold equivalent ounces per year. Cash costs are expected to be

   Chat Online>>

Presentation - Kinross Gold

1 Apr 2014 production costs of sales, all-in cost and capital expenditures, Feasibility study based on 38,000 tpd mill produced promising results. • A mill

   Chat Online>>

Investor Presentation - Northern Sun Mining

2 Dec 2013 Developed Mine infrastructure with fully permitted 2150 tpd Mill. ▫ Targeting Annual Production rate of 80,000 ounces Gold by late 2015.

   Chat Online>>

Alexis Opens its Own Gold Mill to Reduce Costs - QMX Gold

15 Jul 2010 In its fully refurbished state it would have a 1400 tpd capacity and was originally used to mill ore from the Ferderber Gold Mine , atop which the

   Chat Online>>

ROKMASTER RESOURCES CORP. SAN JOSE MILL – NAZCA, PERU

parameters as plans continue to be refined may result in increased costs, that plant, equipment or San Jose copper-gold mill and concentrator, located in southern Peru. The 150 tonne per day (“TPD”) San Jose Mill is expandable and.

   Chat Online>>

Melis Engineering Gold Experience - Gold Mining Metallurgy

5,000 TPD Gravity/Cyanidation/CIP. Mill. Bronson Creek Copper/Gold. -. Metallurgical Operating cost estimates for review of potential copper/gold recovery.

   Chat Online>>

Pictures - Anthem United Inc.

INDUSTRIAL GOLD MILLING. Establish First-mover consolidation in Peruvian gold milling industry. Gold Price vs Grade at 700 tpd (US$M)(2). $1,000.

   Chat Online>>

Montan Mining Corp. Announces Binding Agreement - CNW Group

27 Apr 2015 Announces Binding Agreement to Acquire 150 tpd Capacity Gold Ore proximity to a high concentration of artisanal miners to provide mill feed for tolling. is relatively independent of gold price changes to maintain its strong

   Chat Online>>

TAHOE RESOURCES REPORTS PROFITABLE FIRST QUARTER

8 May 2014 “The ramp-up to 3,500 tonnes per day (tpd) proceeded according to plan, and Silver production amounted to 4.1 million ounces at a total cash cost of $6.68, total Mill recovery of silver, gold, lead and zinc have met early

   Chat Online>>

Magino Updated PEA - Argonaut Gold Inc.

22 Dec 2011 Pre-tax Net Present Value (NPV) at 5% discount rate of $939 million, proposed mill expansion to 20,000 tpd allows Prodigy to expand the

   Chat Online>>

Gainey Receives Multiple $USD Cash Deposits for Gold Ore

Demand proving strong for Gainey mill's optimized gold and silver recovery rates at its 300-tpd (tons per day) mill in the prolific gold/silver Sierra Madre region of center in the area we have a distinct advantage in productivity and costs.

   Chat Online>>

XBG + XHP Projects - Silvercorp Metals Inc.

15 Nov 2013 The main assets include a 350 tonne per day (tpd) flotation mill, The XBG area has been mined by artisanal miners for gold and silver since the late 1980s. . activities at the XHP project as part of its cost saving measures.

   Chat Online>>

Kinross reports results of pre-feasibility study on Tasiast expansion

29 Apr 2013 The PFS was based on constructing a new 30,000 tonne tpd mill at Tasiast It assumed a $1,500 per ounce gold price for overall project

   Chat Online>>

Mill Valuation Study - Avino Silver & Gold Mines Ltd.

At the time of the shutdown the mill was operating at an average rate of 1130 TPD. The concentration ratio (weight) ranged from 2.5 to 3.5% i.e., producing 25-30

   Chat Online>>

10,000 TPD & 3,000 TPD Gold Processing Plants, 900 TPH

Description: 10,000 TPD Gold Processing Plant - Constructed in 1990 as a Conventional Plant ran until 1997 when the mine closed due to low gold prices

   Chat Online>>

Integra Gold to Acquire Sigma-Lamaque Milling - Integra Gold Corp

3 Sep 2014 Operating capacity is in the range of 1,200 to 2,200 tpd. Of that amount, the mark-up attributable to toll milling and the cost of transportation

   Chat Online>>

Goldcorp 2013 Annual Report

The story of 2013 was not just the price of gold. The story was about how Goldcorp responded – with aggressive cost savings, driven by our Operating for

   Chat Online>>

Request a quotation